Implementation Plans

How we plan, track, and implement features and fixes.

Related: WORKFLOW.md — End-to-end flow from idea to implementation


Folder Structure

plans/
├── backlog/ # Approved plans waiting for implementation
├── active/ # Currently being worked on (max 1-2 at a time)
└── completed/ # Done - kept for reference

Flow

Idea/Problem → INVESTIGATE file (if unclear) → PLAN file in backlog/ → active/ → completed/

File Types

INVESTIGATE-*.md

For work that needs research first. The problem exists but the solution is unclear.

This is the most important part of the workflow. The developer should spend most of their time here. A thorough investigation leads to a good plan, which leads to clean implementation. A rushed investigation leads to rework.

When to create:

  • Complex work where options need evaluation
  • Bug with unknown root cause
  • Feature requiring design decisions or architectural choices
  • New tool or library selection

Naming: INVESTIGATE-<topic>.md

Examples:

  • INVESTIGATE-authentication-options.md
  • INVESTIGATE-performance-issues.md

What makes a good investigation:

  • Research best practices — use web search to find how others have solved similar problems, what patterns exist, what pitfalls to avoid
  • Find tools and libraries — and critically, verify they are actively maintained, recently updated, and have healthy community adoption. AI knowledge has a cutoff date and can recommend abandoned projects.
  • Analyse options — document pros and cons of each approach with clear reasoning
  • Check for gaps — after drafting, ask "are there gaps?" or "what could go wrong?" This catches missing steps, overlooked dependencies, and edge cases.
  • Verify findings — AI can hallucinate tools, libraries, or best practices that don't exist. Ask it to verify its recommendations against current sources.
  • Iterate — investigations improve through multiple rounds of questions and analysis. The first draft is rarely complete.

The investigation file is a living document — it captures decisions, rejected options, and the reasoning behind choices. When someone asks "why did we do it this way?" months later, the investigation has the answer.

After investigation: Create one or more PLAN files with the chosen approach.

PLAN-*.md

For work that is ready to implement. The scope is clear, the approach is known.

When to create:

  • Bug fix with known solution
  • Feature request with clear requirements
  • Work scoped by a completed investigation

Naming Conventions:

FormatUse CaseExample
PLAN-<short-name>.mdStandalone plan, no specific orderPLAN-fix-mobile-nav.md
PLAN-<nnn>-<short-name>.mdOrdered sequence, indicates execution orderPLAN-001-data-migration.md

Ordered Plans (PLAN-nnn-*)

When an investigation produces multiple related plans that should be executed in a specific order, use three-digit numbering to indicate the sequence:

PLAN-001-data-migration.md        # Must be done first (foundation)
PLAN-002-schema-update.md # Depends on 001
PLAN-003-ui-components.md # Depends on 002
PLAN-004-integration-tests.md # Depends on 003

When to use ordered numbering:

  • Investigation produces 3+ related plans
  • Plans have sequential dependencies
  • Work is part of a larger initiative

When NOT to use ordered numbering:

  • Standalone bug fix or small feature
  • Plans can be executed in any order
  • Single plan from an investigation

Splitting Investigations into Multiple Plans

When an investigation covers a large initiative, split it into separate ordered plans rather than one monolithic plan. Each plan should be independently completable and deliverable.

How to split:

  1. Group by dependency and risk — phases that need different prerequisites should be separate plans
  2. Group by completeness — each plan should deliver something useful on its own
  3. Keep optional/deferred work separate — don't mix required work with nice-to-haves

Each plan references the investigation and the previous plan in its header:

**Investigation**: [INVESTIGATE-xyz.md](../backlog/INVESTIGATE-xyz.md)
**Prerequisites**: PLAN-001 must be complete first

Plan Structure

Every plan has these sections:

1. Header (Required)

# Plan Title

> **IMPLEMENTATION RULES:** Before implementing this plan, read and follow:
> - [WORKFLOW.md](../../WORKFLOW.md) - The implementation process
> - [PLANS.md](../../PLANS.md) - Plan structure and best practices

## Status: Backlog | Active | Blocked | Completed

**Goal**: One sentence describing what this achieves.

**Last Updated**: YYYY-MM-DD

The IMPLEMENTATION RULES blockquote ensures the AI reads the workflow and plan guidelines before starting work.

2. Dependencies (If applicable)

**Prerequisites**: PLAN-001 must be complete first
**Blocks**: PLAN-003 cannot start until this is done
**Priority**: High | Medium | Low

For ordered plans, dependencies are often implicit in the number order. Only add explicit dependency notes when the relationship is non-obvious.

3. Problem Summary (Required)

What's wrong or what's needed. Be specific.

4. Phases with Tasks (Required)

Break work into phases. Each phase has:

  • Numbered tasks
  • A validation step at the end
## Phase 1: Setup

### Tasks

- [ ] 1.1 Create the config file
- [ ] 1.2 Add validation rules
- [ ] 1.3 Test with sample data

### Validation

User confirms phase is complete.

---

## Phase 2: Implementation

### Tasks

- [ ] 2.1 Update the main component
- [ ] 2.2 Add error handling
- [ ] 2.3 Write tests

### Validation

User confirms implementation works correctly.

5. Acceptance Criteria (Required)

## Acceptance Criteria

- [ ] Feature works correctly
- [ ] No regressions
- [ ] Documentation updated

6. Implementation Notes (Optional)

Technical details, gotchas, code patterns to follow.

7. Files to Modify (Optional but helpful)

## Files to Modify

- `path/to/file.ext`
- `path/to/other.ext`

Status Values

StatusMeaningLocation
BacklogApproved, waiting to startplans/backlog/
ActiveCurrently being worked onplans/active/
BlockedWaiting on something elseplans/backlog/ or plans/active/
CompletedDoneplans/completed/

Updating Plans During Implementation

Critical: Plans are living documents. Update them as you work. Mark each task [x] immediately after completing it, and mark each phase heading as DONE. This is not optional — the plan file is the source of truth for progress. If the AI session is interrupted or context is lost, the plan shows exactly where work left off.

When starting a phase:

## Phase 2: Implementation — IN PROGRESS

When completing a task:

- [x] 2.1 Update the main component ✓
- [ ] 2.2 Add error handling

When a phase is done:

## Phase 2: Implementation — DONE

When blocked:

## Status: Blocked

**Blocked by**: Waiting for decision on approach

When complete:

  1. Update status: ## Status: Completed
  2. Add completion date: **Completed**: YYYY-MM-DD
  3. Move file to plans/completed/

Validation

Every phase ends with validation. The simplest form is asking the user to confirm.

Default: User Confirmation

The AI asks: "Phase 1 complete. Does this look good to continue?"

In the plan, this can be written as:

### Validation

User confirms phase is complete.

Optional: Automated Check

When a command can verify the work, include it:

### Validation

\`\`\`bash
# Command that verifies the work
some-check-command
\`\`\`

User confirms output is correct.

Key Point

Don't force automated validation when it's impractical. User confirmation is valid and often the best approach.


Plan Templates

Simple Bug Fix

# Fix: [Bug Description]

> **IMPLEMENTATION RULES:** Before implementing this plan, read and follow:
> - [WORKFLOW.md](../../WORKFLOW.md) - The implementation process
> - [PLANS.md](../../PLANS.md) - Plan structure and best practices

## Status: Backlog

**Goal**: [One sentence]

**Last Updated**: YYYY-MM-DD

---

## Problem

[What's broken]

## Solution

[How to fix it]

---

## Phase 1: Fix

### Tasks

- [ ] 1.1 [Specific change]
- [ ] 1.2 [Another change]

### Validation

User confirms fix is correct.

---

## Acceptance Criteria

- [ ] Bug is fixed
- [ ] No regressions

Feature Implementation

# Feature: [Feature Name]

> **IMPLEMENTATION RULES:** Before implementing this plan, read and follow:
> - [WORKFLOW.md](../../WORKFLOW.md) - The implementation process
> - [PLANS.md](../../PLANS.md) - Plan structure and best practices

## Status: Backlog

**Goal**: [One sentence]

**Last Updated**: YYYY-MM-DD

---

## Overview

[What this feature does and why]

---

## Phase 1: [Setup/Preparation]

### Tasks

- [ ] 1.1 [Task]
- [ ] 1.2 [Task]

### Validation

User confirms phase is complete.

---

## Phase 2: [Core Implementation]

### Tasks

- [ ] 2.1 [Task]
- [ ] 2.2 [Task]

### Validation

User confirms phase is complete.

---

## Acceptance Criteria

- [ ] [Criterion]
- [ ] [Criterion]
- [ ] Documentation updated

---

## Files to Modify

- `path/to/file.ext`

Investigation

# Investigate: [Topic]

> **IMPLEMENTATION RULES:** Before implementing this plan, read and follow:
> - [WORKFLOW.md](../../WORKFLOW.md) - The implementation process
> - [PLANS.md](../../PLANS.md) - Plan structure and best practices

## Status: Backlog

**Goal**: Determine the best approach for [topic]

**Last Updated**: YYYY-MM-DD

---

## Questions to Answer

1. [Question 1]
2. [Question 2]

---

## Current State

[What exists now]

---

## Options

### Option A: [Name]

**Pros:**
-

**Cons:**
-

### Option B: [Name]

**Pros:**
-

**Cons:**
-

---

## Recommendation

[After investigation, what do we do?]

---

## Next Steps

- [ ] Create PLAN-xyz.md with chosen approach
- For multiple related plans, use ordered naming: PLAN-001-*, PLAN-002-*, etc.

Best Practices

  1. Investigate first — spend time understanding the problem before planning the solution
  2. One active plan at a time — finish before starting another
  3. Small phases — easier to validate and recover from errors
  4. Specific tasks — "Update the config in file.ext" not "Fix the thing"
  5. Update as you go — the plan is the source of truth
  6. Keep completed plans — they're documentation of what was done and why
  7. Ask for gap analysis — "Are there gaps in this plan?" catches issues early